You have been commissioned to develop a challenging maze to be constructed at a stately home. The maze is to be laid out on a grid such as shown in Figure 7.19. Develop a parallel program that will...


You have been commissioned to develop a challenging maze to be constructed at a stately home. The maze is to be laid out on a grid such as shown in Figure 7.19. Develop a parallel program that will find the positions of the hedges that result in the longest time in the maze if one uses the maze algorithm “Keep to the path where there is a hedge or wall on the left,” as illustrated in Figure 7.19, which is guaranteed to find the exit eventually (Berman and Paul, 1997).


Figure 7.19



May 19, 2022
SOLUTION.PDF

Get Answer To This Question

Submit New Assignment

Copy and Paste Your Assignment Here