With the information provided below, find out the actual production:
Quarter budgeted fixed overheads = 4,20,000
Budgeted production = 30,000 units
Fixed overhead cost was over absorbed by 16,000
Fixed overhead expenditure variance= 30,000 (F)
The firm was using absorption costing.