M13
Extracted text: Which parameters do we need to monitor for these water types and why? Water type River water Tube well water Parameter Reason(s) Tannery wastewater effluent Finished drinking water For the AA community, following information about hourly demand is available for 12-hour duration: Water flow rate (m/hr) 24.5 Duration (hours) 0-2 2-4 19.5 4-6 18.5 6-8 23 33.5 47.5 8-10 10-12