Which of the following statements is false?
o The test Readiness Review (TRR) is conducted to ensure that the subsystem, system, or systems under review is ready to proceed into formal test.
o The preliminary Design Review (PDR) is conducted to ensure that the system under review can proceed into detailed design.
o The Alternative Systems Review (ASR) typically occurs during the Material Solution Analysis (MSA) phase and leads to approval of a draft system performance specification for the preferred material solution.
o The operational Test Readiness Review is conducted to demonstrate that the preferred concept is ready to move into Technology Demonstrate that the preferred concept is ready to move into the Technology Development phase.
Already registered? Login
Not Account? Sign up
Enter your email address to reset your password
Back to Login? Click here