Whenever FANUC picks up an item, it will read the UPC. Sometimes when analysing the UPC, the item getsrejected. If validated, FANUC will then inspect the item and calculate a status check. After this check, it will sendthe state information to the system.The system will update the database with new information. At the end of the day, FANUC will send a productionreport to the system. The system will on its turn, send it to production control.It is your task now to develop a use case diagram, modelling FANUC’s processes and interaction withthe PCS-system.
Based on the narrative, draw a use case diagram to model the above behaviour.
Already registered? Login
Not Account? Sign up
Enter your email address to reset your password
Back to Login? Click here