What form should the executive summary take? As with all executive summaries (see the peer review assignment #2) it should have: an introduction showing who the report is addressed to, the context...


What form should the executive summary take?


As with all executive summaries (see the peer review assignment #2) it should have:


an introduction showing who the report is addressed to, the context (describing how &


why it was prepared) and what the report is about.


A body summarising the results


A conclusion stating the main issues & decisions required


2 How do I decide what risks to put in the before and after risk matrix?


The start of a risk assessment is a brainstorm to decide all the reasonably foreseeable risks.


For each risk you then determine an order of magnitude $ estimate of the consequences and


multiply this by an estimated probability such as 1/10,000. The result is a probable value


which can be used to sort the list from largest (most significant) to smallest (least


significant). Put the top 12 in your risk management plan. Then work out a strategy to


manage and minimise the risks for the top 5 and put these results in the before and after


risk matrix.


3.How do I decide what costs to put in the estimate of the cost to prepare a bid for a contractin the chosen area of business?


You must make you own estimate of the time and work hours required for each of theactivities listed in 2.1. You will not be marked on the accuracy of any estimate but will be


assessed on the reasonableness and logic or how you put it together.


4. What are the site visits referred to in the activities list?These are items 4 and 14 of the activity list.