Use mean values of the material intensities of Table 12.2 to compare the number of metric tons of materials required to build a nominal 0.5 GW of new generating power by (a) nuclear, (b) single...


Use mean values of the material intensities of Table 12.2 to compare the number of metric tons of materials required to build a nominal 0.5 GW of new generating power by (a) nuclear, (b) single crystal solar PV power, and (c) land-based wind sources. How do these tonnages change if 0.5 GW of actual, not nominal, power is to be built?