Two products are manufactured by FBGNPU422 Corp. FBGNPU422 uses conventional job-order costing with a plantwide predetermined overhead rate and direct labor hours as the allocation base. FBGNPU422's...


Two products are manufactured by FBGNPU422 Corp.<br>FBGNPU422 uses conventional job-order costing with a plantwide predetermined overhead rate and direct labor hours as the<br>allocation base.<br>FBGNPU422's records reveal the following per-unit costs for direct materials and direct labor:<br>Product A<br>Product B<br>Production volume (units)<br>5,000<br>$42<br>2,000<br>$37<br>Direct materials<br>(ID#12705)<br>Direct labor:<br>2 hours at $10/hour<br>5 hours at $10/hour<br>$20<br>$50<br>FBGNPU422's accountants are thinking about a shift to activity-based costing and they collected the following MOH data:<br>Expected Activity<br>Product A<br>Activity Cost Pool<br>Setups<br>General factory<br>Machine processing<br>Estimated OH Cost<br>Activity cost driver<br>Number of setups<br>Product B<br>$360,000<br>$2,140,000<br>$280,000<br>80<br>40<br>10,000<br>2,000<br>Direct labor hours<br>10,000<br>1,000<br>Machine hours<br>Q: Assuming that FBGNPU422's actual and expected direct labor hours are the same, what is the unit product cost of Product B under<br>conventional job-order costing?<br>A: $<br>< Prev<br>Next ><br>10 of 25<br>

Extracted text: Two products are manufactured by FBGNPU422 Corp. FBGNPU422 uses conventional job-order costing with a plantwide predetermined overhead rate and direct labor hours as the allocation base. FBGNPU422's records reveal the following per-unit costs for direct materials and direct labor: Product A Product B Production volume (units) 5,000 $42 2,000 $37 Direct materials (ID#12705) Direct labor: 2 hours at $10/hour 5 hours at $10/hour $20 $50 FBGNPU422's accountants are thinking about a shift to activity-based costing and they collected the following MOH data: Expected Activity Product A Activity Cost Pool Setups General factory Machine processing Estimated OH Cost Activity cost driver Number of setups Product B $360,000 $2,140,000 $280,000 80 40 10,000 2,000 Direct labor hours 10,000 1,000 Machine hours Q: Assuming that FBGNPU422's actual and expected direct labor hours are the same, what is the unit product cost of Product B under conventional job-order costing? A: $ < prev="" next=""> 10 of 25

Jun 10, 2022
SOLUTION.PDF

Get Answer To This Question

Related Questions & Answers

More Questions »

Submit New Assignment

Copy and Paste Your Assignment Here