Total excavated soil The amount of backfill needed utilizing the excavated soil considering compaction with 20% shrinkage factor. Is there a waste or extra loose soil? How many in terms of volume?...



  1. Total excavated soil

  2. The amount of backfill needed utilizing the excavated soil considering compaction with 20% shrinkage factor.

  3. Is there a waste or extra loose soil? How many in terms of volume?


Legend:


C-2 = Column 2


F-2 = Footing 2


C-1 = Column 1


F-1 = Column 1



Technical Description:


Column 1 size = 350 mm x 350 mm


Column 2 size = 250 mm x 250 mm


Footing 1 size = (LxWxT) = 1400 mm x 1400mm x 400 mm


Footing 2 size = (LxWxT) = 1000 mm x 1000 mm x 250 mm



Note: Depth of foundation from batural ground level are;



C-1, F-1 = 1.40 m


C-2, F-2 = 1.10 m


С-1<br>C-2만<br>C-2<br>F-1<br>F-2<br>F-2<br>С-1<br>모 C-2<br>F-1<br>C-2<br>F-2<br>F-2<br>C-1<br>C-1<br>F-1<br>F-1<br>

Extracted text: С-1 C-2만 C-2 F-1 F-2 F-2 С-1 모 C-2 F-1 C-2 F-2 F-2 C-1 C-1 F-1 F-1