THydropower Plant System The following nametag is specification of a generator in a hydropower plant. MITSUBISHI AC GENERATOR Output Voltage 4. 84.5 MVA 11 kV Current Frequency Speed Power Factor 4435...


THydropower Plant System<br>The following nametag is specification of a generator in a hydropower plant.<br>MITSUBISHI AC GENERATOR<br>Output<br>Voltage<br>4.<br>84.5 MVA<br>11 kV<br>Current<br>Frequency<br>Speed<br>Power Factor<br>4435 A<br>50 Hz<br>600 RPM<br>0.86<br>|Calculate the generated peak voltage.<br>| Calculate real power of the following generator.<br>How many pair-of-poles installed in the generator?<br>Why does not the generator consist of one pair-of-poles only?<br>J Why for water turbine the speed is 600 rpm not 3000 rpm such as in steam<br>turbine?<br>a.<br>b.<br>C.<br>d.<br>е.<br>f.<br>Explain why the turbine is located below the generator.<br>

Extracted text: THydropower Plant System The following nametag is specification of a generator in a hydropower plant. MITSUBISHI AC GENERATOR Output Voltage 4. 84.5 MVA 11 kV Current Frequency Speed Power Factor 4435 A 50 Hz 600 RPM 0.86 |Calculate the generated peak voltage. | Calculate real power of the following generator. How many pair-of-poles installed in the generator? Why does not the generator consist of one pair-of-poles only? J Why for water turbine the speed is 600 rpm not 3000 rpm such as in steam turbine? a. b. C. d. е. f. Explain why the turbine is located below the generator.

Jun 10, 2022
SOLUTION.PDF

Get Answer To This Question

Related Questions & Answers

More Questions »

Submit New Assignment

Copy and Paste Your Assignment Here