The LINDO output in Figure 41 can be used to determine the critical path for Problem.
PROBLEM
Consider the (simplified) list of activities and predecessors that are involved in building a house (Table).
Immediate
Duration
Activity
Description
Predecessors
(Days)
A
Build foundation
—
5
B
Build walls and ceilings
8
C
Build roof
10
D
Do electrical wiring
E
Put in windows
4
F
Put on siding
6
G
Paint house
C, F
3
FIGURE 41
LINDO Output for Problem 8
MIN
X6 - X1
SUBJECT TO
2) - X1 + X2 >=
3) - X2 + X3 >=
4) - X3 + X4 >=
5) - X3 + X5 >=
6) - X4 + X5 >=
7)
X6 - X3 >=
8)
X6 - X5 >=
END
LP OPTIMUM FOUND
AT STEP
OBJECTIVE FUNCTION VALUE
1)
26.0000000
VARIABLE
VALUE
REDUCED COST
X6
26.000000
0.000000
X1
X2
5.000000
X3
13.000000
X4
17.000000
X5
23.000000
ROW
SLACK OR SURPLUS
DUAL PRICES
2)
-1.000000
3)
4)
5)
6)
8.000000
NO. ITERATIONS=
RANGES IN WHICH THE BASIS IS UNCHANGED
OBJ COEFFICIENT RANGES
CURRENT
ALLOWABLE
COEF
INCREASE
DECREASE
1.000000
INFINITY
RIGHTHAND SIDE RANGES
RHS
2
4.000000
10.000000
6.000000
7
3.000000
Use this output to do the following:
a Draw the project diagram.
b Determine the length of the critical path and the critical activities for this project.