The example and x R chart in Chapter 10 indicated that samples numbered 8, 9, 10, 12, 13, and 18 were out of control (i.e., an unpredictable process). The process specifications are 0.4037 0.0013 (i.e., 0.4024 to 0.4050). Tabular and calculated values will be in units of 0.0001 (i.e., the specification limits will be considered 24 to 50). Assume that for each of these data points, circumstances for an out-of-control response were identified and will be avoided in future production. Determine the process capability/performance metrics of the remaining 14 subgroups, which are as follows: