The continuous timing method in direct time study was used to obtain the element timesfor a worker-machine task as indicated in the table below. Element c is a machine-controlledelement and the time is constant. Elements a, b, d, e, and f are operator-controlled andexternal to the machine cycle, and they were performance rated at 80%. If the machineallowance is 25%, and the worker PFD allowance is 15%, determine (a) the normal time,(b) the standard time for the cycle, and (c) the worker’s efficiency if the worker completes360 work units working 7.2 hr on an 8-hour shift.