The assignment one project is to develop a project costing system. The system is a bespoke system.
The system must be able to create a cost baseline, cash flow forecast, earned value management calculations and percentage complete proposal. The system will be able to have data entered, data imported via comma delimited files orXML.
It is necessary to purchase a server to run the system and 30 client PCs. The PCs need to be configured with Windows 10
and added to an existing network. The server needs to be setup and tested. Subcontractors will be required to develop the
software
•    The project requires at a minimum the high-level work activity as follows.
•    requirements gathering
•    technical specification
•    server installation
•    client PC setup
•    unit test of all developments
•    user acceptance testing of the application
•    training
•    go live support
•    project review
The above elements need to be expanded to create a project plan.