The article “Multi-objective Scheduling Problems: Determination of Pruned Pareto Sets” (H. Taboada and D. Coit, IIE Transactions, 2008:552–564), presents examples in a discussion of optimization methods for industrial scheduling and production planning. In one example, seven different jobs were performed on each of five machines. The means and standard deviations of the processing times for each machine are presented in the following table.
Machine
Mean
SD
Sample Size
A
25.43
10.67
7
B
23.71
13.92
C
44.57
15.90
D
23.14
12.75
E
58.00
19.11
Already registered? Login
Not Account? Sign up
Enter your email address to reset your password
Back to Login? Click here