Taveras Corporation is currently operating at 50% of its available manufacturing capacity. It uses a job- order costing system with a plantwide predetermined overhead rate based on machine-hours. At...


Taveras Corporation is currently operating at 50% of its available manufacturing capacity. It uses a job-<br>order costing system with a plantwide predetermined overhead rate based on machine-hours. At the<br>beginning of the year, the company made the following estimates:<br>Machine-hours required to support estimated production<br>Fixed manufacturing overhead cost<br>Variable manufacturing overhead cost per machine-hour<br>165,000<br>$ 1,980,000<br>2$<br>2.00<br>Required:<br>1. Compute the plantwide predetermined overhead rate.<br>2. During the year, Job P90 was started, completed, and sold to the customer for $2,500. The following<br>information was available with respect to this job:<br>Direct materials<br>Direct labor cost<br>Machine-hours used<br>$ 1,150<br>24<br>830<br>72<br>Compute the total manufacturing cost assigned to Job P90.<br>

Extracted text: Taveras Corporation is currently operating at 50% of its available manufacturing capacity. It uses a job- order costing system with a plantwide predetermined overhead rate based on machine-hours. At the beginning of the year, the company made the following estimates: Machine-hours required to support estimated production Fixed manufacturing overhead cost Variable manufacturing overhead cost per machine-hour 165,000 $ 1,980,000 2$ 2.00 Required: 1. Compute the plantwide predetermined overhead rate. 2. During the year, Job P90 was started, completed, and sold to the customer for $2,500. The following information was available with respect to this job: Direct materials Direct labor cost Machine-hours used $ 1,150 24 830 72 Compute the total manufacturing cost assigned to Job P90.

Jun 10, 2022
SOLUTION.PDF

Get Answer To This Question

Related Questions & Answers

More Questions »

Submit New Assignment

Copy and Paste Your Assignment Here