Task back to top Network Engineering / Systems administration Solution Design Document (Draft) and Test Plan The purpose of a Solution Design Document is to provide a thorough and complete description...

1 answer below »

Task



back to top



Network Engineering / Systems administration



Solution Design Document (Draft) and Test Plan






The purpose of a Solution Design Document is to provide a thorough and complete description of your proposed solution.




It has to include the logical (network topology, addressing, naming, VLANs, VPNs etc) as well as the physical design (which equipment to use, chosen LAN and WAN technology etc) for solution and provide information on how the design is to be implemented (Installation plans, user guides, administration plans etc). The design decisions that you have made need to be justified by referring back to the customer requirements set out in the Requirements Specification. You will need to show how your proposed design is a valid solution to fulfil these requirements. An electronic copy of the templates for the Design Document can be found in the resources section of the ITC306 Interact site.







Test plan


The purpose of a test plan is to clearly document the testing parameters for the system you are building in order to ensure the system is accurately evaluated against the system requirements documented in Assessment Item 2.


Please note you are allowed to work in group/team to develop a solution and encouraged to submit a single assessment. However please note that you will be assessed individually based on your performance.







IT Management /Business Analysis


You are required to submit:



Detailed Project Management Plan


An updated detailed Project Management Plan that includes:



  • Quality Management plan

  • High-level WBS and budget

  • Change Control plan



Reporting Templates


Templates for your team submissions including:



  • Change request forms

  • Change log,

  • Issue log,

  • Team meeting agenda and minutes

  • other templates as identified


Please note that this is not a group/team assignment each student MUST submit the individual assessment.


Rationale



back to top


This assessment task will assess the following learning outcome/s:



  • be able to identify and apply appropriately the different steps in the project development, as well as develop the main artefacts of the process, using project management tools to assist in timely completion of milestones.

  • be able to analyse and document requirements using appropriate modelling techniques and tools.

  • be able to evaluate and determine suitable technologies to be used in the project.

  • be able to demonstrate effective communication skills.



Network Engineering / Systems administration



  • Demonstrate student’s ability to apply appropriately the different steps in the project development, as well as develop the main artifacts of the process.



IT Management /Business Analysis



  • Demonstrate student’s ability to apply appropriately the different steps in the project development, as well as develop the main artifacts of the process.


Marking criteria and standards



back to top



Network Engineering / Systems administration














































Criteria



HD



DI



CR



PS



FL



Design matches documented project requirements (10)



Design correctly addresses all project requirements using an industry standard solution
(with the exception of approved workarounds)



Design correctly addresses all project requirements using a solution that will work but isn’t aligned with what happens in the industry (with the exception of approved workarounds)



Design correctly addresses almost all (80%+) project requirements



Design correctly addresses all key project requirements



Design fails to adequately address all key project requirements



Implementation plan matches documented project requirements (5)



Implementation plan would allow an IT professional to implement your design and meet all project requirements without any further clarifications



Implementation plan would allow an IT professional to implement your design and meet all project requirements with minimal clarifications



Implementation plan would allow an IT professional to implement your design and meet all project requirements with some minor clarifications



Implementation plan would allow an IT professional to implement your design and meet most project requirements with some minor clarifications



Implementation plan would not allow an IT professional to implement your design and meet most project requirements with some minor clarifications



Testing parameters forevaluation of system performance against business, functional and technical requirements are correctly identified and analysed (5)



Testing parameters will allow for accurate testing of all business, functional and technical requirements



Testing parameters will allow for accurate testing of most business, functional and technical requirements



Testing parameters will allow for accurate testing of key business, functional and technical requirements



Testing parameters will allow for accurate testing of essential business, functional and technical requirements



Testing parameters will not allow for accurate testing of one or more essential business, functional and technical requirements



Documentation quality (5)



All documentation is at or above industry standard including a table that links project requirements to design section.



Most documentation is at or above industry standard with the remainder at a high academic standard.



Documentation meets all expected academic standards but missing formatting or content that would be expected in the industry.



Documentation meets most expected academic standards.



Documentation fails to meets most expected academic standards.








IT Management /Business Analysis






































Criteria



HD



DI



CR



PS



FL



PMP contains all required information (10)



Effectively builds upon supplied a template to provide all relevant information



Supplied template is adapted to provide all requested information and additional relevant information



Supplied template is accurately completed with all requested information



Supplied template is accurately completed with most requested information



Supplied template not completed accurately or completely



PMP demonstrates effective written communication skills (5)



Consistent application of industry standard language and formatting



Well written with some demonstration of industry standard language and formatting



Well written with a demonstration of academic standard language and formatting



Well written but lacks acceptable formatting



Writing is not of an acceptable standard.



Templates contain all required information and are clear, easy to use, consistent formatting (10)



All templates developed. Templates capture all relevant information. Well designed. Consistent application of industry standard language and formatting



Most or all templates developed. Templates capture most of the required information. Well designed with some demonstration of industry standard language and formatting



Most or some templates developed. Some design issues or inconsistencies. Written with some demonstration of industry standard language and formatting



Most or some templates developed. Design issues or inconsistencies. Not all relevant information captured.



Templates are not of an acceptable standard.



Requirements



back to top


IT Management / Business Analysis students- you must also submit your MS Project files

Answered Same DaySep 04, 2020

Answer To: Task back to top Network Engineering / Systems administration Solution Design Document (Draft) and...

Amit answered on Sep 12 2020
145 Votes
Full Name :
    
    Student ID :
    
    Subject :
    ITC306
    Assignment No :
    
    Due Date :
    
    Lecturer’s Name :
    
Network infrastructure and test plan for new office of Virtucon Consultancy
Your Name:
Your Email:
College name, University name, Country name
Table of Contents
1.    Proposed design of network topology to new office
of Virtucon Consultancy    3
2.    Naming and addressing plan for new office    4
3.    Creation of VLAN and VPN for new office of Virtucon Consultancy    6
4.    Used equipments in new office with installation and administration plan, user guidelines    7
5.    Required security measures at new office of Virtucon Consultancy    9
6.    Test plan for new office    9
7.    References:    11
1. Proposed design of network topology to new office of Virtucon Consultancy
The creation of new office to Virtucon Consultancy requires a proper implementation of new network design in which the required topology can be easily implemented. The development of VLAN at new office and IP allocation will require different equipments so that effective working can be carried out at new office of Virtucon Consultancy. The implemented network topology and devices are selected according to future requirements of the Virtucon Consultancy. The network infrastructure of new office will decide the complete operations of it [Doherty & Asprey, 2014]. The main office of Virtucon Consultancy is also connected to it. For developing the network topology, I have assumed that new office of Virtucon Consultancy is having nearby 100 employees who are working in five different departments. The VLAN development and IP allocation is also developed on the bases of these assumed 100 employees. Thus, the developed network design to show the implementation of equipments for new office of Virtucon Consultancy is provided below:
(
New Branch
) (
Main office
)
2. Naming and addressing plan for new office
As assumed initially that new office of Virtucon Consultancy is having nearby 100 employees who are working in five different departments [Wódczak, 2015]. The table to show these departments with number of employees working required to implement IP addressing and VLAN creation is provided below:
    Sr. No.
    Department name
    Total employees
    1.
    IT department
    10
    2.
    R & D department
    20
    3.
    Technical consultancy service department
    30
    4.
    Management and HR department
    15
    5.
    Marketing and sales department
    25 (including CEO of new office)
The developed IP addressing on bases of each department for new office of Virtucon Consultancy is provided below:

    Sr. No.
    Department name
    Required IP addresses for all employees
    Subnet mask of required IP addresses
    Range of hosting addresses
    1.
    IT department
    10
    192.165.10.0 to 255.255.255.240
    192.160.10.1 to 192.160.10.10
    2.
    R & D department
    20
    192.165.11.0 to 255.255.255.240
    192.160.11.1 to 192.160.11.20
    3.
    Technical consultancy service department
    30
    192.165.12.0 to 255.255.255.240
    192.160.12.1 to 192.160.12.30
    4.
    Management and HR department
    15
    192.165.13.0 to 255.255.255.240
    192.160.13.1 to 192.160.13.15
    5.
    Marketing and sales department
    25 (including CEO of new office)
    192.165.14.0 to 255.255.255.240
    192.160.14.1 to 192.160.14.25
The developed IP addressing on bases of external equipments for new office of Virtucon Consultancy is provided...
SOLUTION.PDF

Answer To This Question Is Available To Download

Related Questions & Answers

More Questions »

Submit New Assignment

Copy and Paste Your Assignment Here