Task 2 The cells of the battery are treated using a programmable lathe machine. The machine has 15 programs that are able to control its speed. Program 1 has 11 (N( 1) = 11) different speeds that can...


Answer this question. Part (4), (5), (6) & (7).


Task 2<br>The cells of the battery are treated using a programmable lathe machine. The machine has 15<br>programs that are able to control its speed. Program 1 has 11 (N( 1) = 11) different speeds that<br>can vary from 100 revolution per minute (rev/min) to 1100 (rev/min). Program 2 has 13 (N.<br>(2) =13) speeds that can vary from 110 rev/min to 1430 rev/min (X1(1) = 100, X2(1)=110,<br>and so on). The number of speeds of the higher programs increases using geometric progression<br>and the speeds within the same program follow the same pattern of the common difference<br>achieved in program 1 and 2 and increase using arithmetic progression.<br>1.<br>Determine the general formulas of the speeds of the programs and the number of<br>speeds of the programs.<br>Construct a sequence using the final speed of each program. Is there any relation<br>between these speeds?<br>Determine the number of speeds of program 10, and the value of speed number 7<br>within program 10.<br>Determine the total number of speeds that can be produced.<br>Determine the value of the maximum speed that can be produced by the lathe<br>machine.<br>2.<br>4.<br>5.<br>If a speed of 3000 rev./min is required to handle a specific manufacturing task, which<br>(program/s) can be used to achieve it exactly. On the other hand, if the program<br>cannot achieve the speed of 3000 rev./min; recommend the speed that can be used<br>6.<br>and the program that can provide the closest value of 3000 rev./min.<br>Repeat a-f if the number of speeds is increased arithmetically (N is now arithmetic)<br>and the speeds within each program is varied geometrically (Xi i=1: 15)using the<br>same pattern.<br>7.<br>3.<br>

Extracted text: Task 2 The cells of the battery are treated using a programmable lathe machine. The machine has 15 programs that are able to control its speed. Program 1 has 11 (N( 1) = 11) different speeds that can vary from 100 revolution per minute (rev/min) to 1100 (rev/min). Program 2 has 13 (N. (2) =13) speeds that can vary from 110 rev/min to 1430 rev/min (X1(1) = 100, X2(1)=110, and so on). The number of speeds of the higher programs increases using geometric progression and the speeds within the same program follow the same pattern of the common difference achieved in program 1 and 2 and increase using arithmetic progression. 1. Determine the general formulas of the speeds of the programs and the number of speeds of the programs. Construct a sequence using the final speed of each program. Is there any relation between these speeds? Determine the number of speeds of program 10, and the value of speed number 7 within program 10. Determine the total number of speeds that can be produced. Determine the value of the maximum speed that can be produced by the lathe machine. 2. 4. 5. If a speed of 3000 rev./min is required to handle a specific manufacturing task, which (program/s) can be used to achieve it exactly. On the other hand, if the program cannot achieve the speed of 3000 rev./min; recommend the speed that can be used 6. and the program that can provide the closest value of 3000 rev./min. Repeat a-f if the number of speeds is increased arithmetically (N is now arithmetic) and the speeds within each program is varied geometrically (Xi i=1: 15)using the same pattern. 7. 3.
Jun 02, 2022
SOLUTION.PDF

Get Answer To This Question

Related Questions & Answers

More Questions »

Submit New Assignment

Copy and Paste Your Assignment Here