Suppose we modify the production model from Section 1.3 to obtain the following mathematical model:
Max 10x
s.t.
ax 40
x > 0
whereais the number of hours required for each unit produced. Witha_ 5, the optimal solution isx_ 8. If we have a stochastic model in which the value ofavaries between 3 and 6 (i.e.,a_ 3,a_ 4,a_ 5, ora_ 6) as the possible values for the number of hours required per unit, what is the optimal value forx? What problems does this stochastic model cause?