Suppose in the original Grand Prix example that the routes from plant 2 to region 1 and from plant 3 to region 3 are not allowed. (Perhaps there are no railroad lines for these routes.) How would you modify the original model (Figure 5.2) to rule out these routes? How would you modify the alternative model (Figure 5.7) to do so? Discuss the pros and cons of these two approaches.
Figure 5.2
Figure 5.7