Submission Guidelines: All submissions are to be submitted through turn-it-in. Drop-boxes linked to turn-it-in will be set up in the Unit of Study Moodle account. Assignments not submitted through these drop-boxes will not be considered. Submissions must be made by the due date and time (which will be in the session detailed above) and determined by your Unit coordinator. Submissions made after the due date and time will be penalized at the rate of 10% per day (including weekend days). The turn-it-in similarity score will be used in determining the level if any of plagiarism. Turn-it-in will check conference web-sites, Journal articles, the Web and your own class member submissions for plagiarism. You can see your turn-it-in similarity score when you submit your assignment to the appropriate drop-box. If this is a concern you will have a chance to change your assignment and resubmit. However, re-submission is only allowed prior to the submission due date and time. After the due date and time have elapsed you cannot make re-submissions and you will have to live with the similarity score as there will be no chance for changing. Thus, plan early and submit early to take advantage of this feature. You can make multiple submissions, but please remember we only see the last submission, and the date and time you submitted will be taken from that submission. Your document should be a single word or pdf document containing your report. Your report or critique must include: • Title Page: The title of the assessment, the name of the paper you are reviewing and its authors, and your name and student ID. • Introduction: A statement of the purpose for your report and a brief outline of how you will discuss the selected article (one or two paragraphs). Make sure to identify the article being reviewed. • Body of Report: Describe the intention and content of the article. If it is a research report, discuss the research method (survey, case study, observation, experiment, or other method) MITS5001 Assessment 3 Copyright © 2015-2018 VIT, All Rights Reserved. 5 and findings. Comment on problems or issues highlighted by the authors. Discuss the conclusions of the article and how they are relevant to what you are studying this semester. • Conclusion: A summary of the points you have made in the body of the paper. The conclusion should not introduce any ‘new’ material that was not discussed in the body of the paper. (One or two paragraphs) • References: A list of sources used in your text. They should be listed alphabetically by (first) author’s family name. Follow the IEEE style. • The footer must include your name, student ID, and page number
Answered Same DayApr 24, 2021MITS5001

Answer To: Submission Guidelines: All submissions are to be submitted through turn-it-in. Drop-boxes linked to...

Shikha answered on May 01 2021
144 Votes
Project Management Report – Atlas Health Insurance
Submitted By
Course
Professor
Date
Introduction
We have given the scenario of Atlas health insurance provider located in southeast region. The company was using on MS Access data management system but later on, realized that MS Access is not efficient for the purpose of large data set. Also, security of MS Access is very limited. The management decided to migrate data from MS Access to Oracle database system. The m
ain reason for migration to Oracle is because of its flexibility, ability in managing large amount of data, its expandability and the referential integrity. The project was given to the pharmacy department (PD). The project will be developed using Waterfall methodology. The main objective of this report is to make the feasible analysis of the project in the constrained budget and constrained time by making risks assessment. Also, the stakeholder analysis and communication plan are developed in this report.
Assumptions
· The latest version of Oracle will be used to transfer the data.
· The data will be converted into client server model.
· The database server will be configured in separate machine and will be kept at separate room with all the security mechanism.
· Only authorized users will be given the access of the database server.
Literature Review
Project Scope Management
The process of characterizing the work that is required and afterward ensuring that all of that work is done is known as project scope management. Product Scope Management includes the process of planning, developing work breakdown structure and verifying, and then controlling the scope of the project. The statement of the project scope is critical as all the support of sponsors depend on this statement. This statement will help in providing the sponsor's confidence in order to achieve the project objective. The definition and management of project scope will include understanding, documenting as well as implementing requirements that are required to fulfill the objective and goals. It is the first step in successful management of the project. [1]
Project Scope
The main scope of the project is to implement Oracle database by connecting to the existing system. The data must be safely transferred from MS Access to Oracle database.
Integration Management
Project integration management, as well as project management, plays an important role in the success of the project. This integration management incorporate the role of skilled project managers who work together as a team with stakeholders and the project team in order to guarantee that the objective of the project is fulfilled. Project integration management alludes to the activities that are required in integrating various PM elements that are recognized, characterized, combined, integrated, and facilitated inside the Project Management team. This integration management is very important for the success of the project. It guarantees that the entirety of the components that are important to finish a project meet up. As we probably are aware that Integration management carries on with the project management life cycle from beginning to closure and most essentially in the project planning phase. [2]
Project Development Methodology
According to the given scenario, waterfall methodology will be used to transfer data from Access to Oracle. The main reason for using waterfall instead of agile is that Atlas requires to transfer data only in the existing system. They do not require to develop the system from beginning. The model is considered to offer a very much characterized set of prerequisite indications before really beginning the transfer process and usage of the undertaking, in this manner, offering a premise plan of the undertaking and proceeding in a methodical sequence of phases. [3]
The issue with the waterfall model is that the quick changes are not easily implemented with the change in requirements of stakeholders. As the project is to change the database, and no further changes are required in the system, therefore waterfall will be efficient approach for the execution of the project. The entire proceeding of the project will be divided into some phases like project initiation, project planning, implementation, testing, deployment and maintenance.
Stakeholder Management
Stakeholder management is the process of execution of management functions of planning, organizing, motivating, directing and controlling the project activities. Both internal as well as external stakeholders can be a part of the stakeholder management process. The stakeholder’s role is very critical as they are the person who actually defined the features of the system. Stakeholders are the...