STEPS: 1.Replicate the BPMN diagram using the Yauqiang BPMN Editor (from http://sourceforge.net/projects/bpmn/2. Download THIS EXCEL WORKBOOKOnce you have analyzed the data, PLEASE UPLOAD YOUR EXCEL...

STEPS:
1.Replicate the BPMN diagram using the Yauqiang BPMN Editor (from http://sourceforge.net/projects/bpmn/2. Download THIS EXCEL WORKBOOKOnce you have analyzed the data, PLEASE UPLOAD YOUR EXCEL FILE HERE3. Next, you will need to construct a simulation in an Excel worksheet which mimics the observed behaviors of the dataset. Your simulation can be tested by comparing the statistics from the original data to those of the simulation output, including the shapes of the distribution curves. Make sure your simulation is built to produce at least as many samples as the original data had provided.4. Once you are satisfied with the simulation and its reports (stats, charts, etc.), make a copy of the simulation worksheet. (Right-click on the worksheet tab, click on "Move or Copy...", check the box labeled "Create a copy", and click on "OK".) This worksheet will be used to create a simulation representing modifications to the original.5. Create a new PowerPoint file. The first slide should be labeled with "MIS-432, Spring 2021", your name. All subsequent slides should have appropriate labels at the top:6. An image of your version of the BPMN diagram of the process.Statistics derived from your original dataset.Statistics from the simulation and comparisons to the originals.Statistics and decisions related to the questions asked below.An image showing your alterations to the original BPMN diagram.Statistics and decision related to the structural change in the process.Any close-out materials.7. Answer these questions related to changes in the operation of the original process, and include your answers in the appropriate slide(s). SHOW YOUR WORK!a. If we were to purchase a new computer-controlled reductive-manufacturing platform capable to reducing the metal-working time to build a new custom piece by an average of two days and cutting the standard deviation in half, will it make a significant difference in the total time to produce our jewelry?b. If we were to hold more gemstones in inventory, reducing the need to order and wait by 50%, will this make a significant difference in the total time to produce our jewelry?8. Redesign the BPMN diagram to allow for the complete out-sourcing of all scratch-built pieces that will include a gemstone. The 3rd-party vendor guarantees delivery within three weeks, and is usually able to get the completed piece, with the gemstone already in place, to your shop in 12-14 days, and occasionally even quicker. Will this change make a significant difference in the overall time needed to produce your jewelry? Show how you justify your answer.
Just only need to analyze the excel and answer the 7th and 8th questions for me!
Apr 12, 2021
SOLUTION.PDF

Get Answer To This Question

Related Questions & Answers

More Questions »

Submit New Assignment

Copy and Paste Your Assignment Here