Richard Vaughan, the project manager for the France Vacances project, has decided to use a waterfall lifecycle for the development with the following stages:
1 Analysis of requirements and production of requirements specification 2 Technical design 3 Code and test of programs 4 Integration and system test 5 User training 6 Acceptance testing 7 Implementation.
For stages 1 and 2, the two development teams will work together, then stages 3 to 5 will be undertaken as two parallel projects. Finally, stages 6 and 7 will be done as one project. This lifecycle is illustrated in Figure 6.6.