Requirements:1. Prepare the production report2. Assume normal spoilage of 5% is discovered at inspection point wherein inspection point is @ 50% stage of completion and 70% of materials is added after th inspection point and the remaining 30% is added at the end of the production. Prepare the production report3. Assume normal spoilage of 5% is discovered at inspection point wherein inspection point is @ 70% stage of completion and 70% of materials is added after th inspection point and the remaining 30% is added at the end of the production. Prepare the production report
Already registered? Login
Not Account? Sign up
Enter your email address to reset your password
Back to Login? Click here