Diploma Apply Structural Principles to Medium Rise CPCCBC508A: AT2 Portfolio Medium Rise - Drawings and Specifications, 1. Demolition of an existing structure on a medium rise building. · Provide all...

1 answer below »
reports must be done under:Australian standardsNCC vol 1safe work Australia


Diploma Apply Structural Principles to Medium Rise CPCCBC508A: AT2 Portfolio Medium Rise - Drawings and Specifications, 1. Demolition of an existing structure on a medium rise building. · Provide all the permits and documents needed for this to happen. · Explain Legislative requirements to be followed for safe demolition · Explain Planning requirements to be followed for safe demolition · Explain safe work practices to be followed for safe demolition 2. Analyse Construction of a Medium rise building. · Document Demolition process and explain · Describe safe demolition practices · Research from plans and specs of what services are required here? (Plan been provided ) · Materials being used for structural performance requirements (Research from plans and specs · Describe soil suitability and how to get the information. · Retaining wall/ structure to be implemented in construction process. What needs to be done · Any Bracing that needs to be temporarily required? Research from plans and specs 3. Management and Construction of Footing Systems · Check footings for correct set out and compliance (explain the process and procedure) · Assess specified footings for compliance (what codes and standards and regulations relate to be acceptable) · Explain correct installation process. · Explain methods for provision of termite barrier/ damp proofing · Explain process for checking and meeting compliance. 4. Coordinating and managing structural elements of the construction process · List down the structural members and what they are from the plans/ documents provided. · Describe the process for ensuring compliance with installation of structural components. · Examine whether there is sufficient room for the require services and explain why. · Propose any potential problems or faults in the construction process (minimum 5 required) 5. Organise meeting with Structural Engineer for construction of a retaining wall · Write an email to the Structural Engineer enquiring whether a retaining wall needs to be established due to the situation Microsoft PowerPoint - Photo Review Option Chisholm Tafe – Construction Technology CPCCBC5018A - Apply structural principles to the construction of medium rise buildings Photographic Review & Annotation Assessment CONSTRUCTION TECHNOLOGY CPCCBC5018A Medium Rise Structures · Identify the main structural principles in the following photo’s · List any specific requirements that would need to be considered for demolition of each photo. · Utilise these photo’s to aide in your reports for this unit. · You are required to provide only two of your own Commercial Building Photos in any class from 2 to 9, if using this Review Document · Ask questions if there is anything you don’t understand CONSTRUCTION TECHNOLOGY CPCCBC5018A Medium Rise Structures Photo #1 CONSTRUCTION TECHNOLOGY CPCCBC5018A Medium Rise Structures Add in here comments to the Photo: Photo #1 (Photo comments) CONSTRUCTION TECHNOLOGY CPCCBC5018A Medium Rise Structures Photo #2 CONSTRUCTION TECHNOLOGY CPCCBC5018A Medium Rise Structures Add in here comments to the Photo: Photo #2 (Photo comments) CONSTRUCTION TECHNOLOGY CPCCBC5018A Medium Rise Structures Photo #3 CONSTRUCTION TECHNOLOGY CPCCBC5018A Medium Rise Structures Add in here comments to the Photo: Photo #3 (Photo comments) CONSTRUCTION TECHNOLOGY CPCCBC5018A Medium Rise Structures Photo #4 CONSTRUCTION TECHNOLOGY CPCCBC5018A Medium Rise Structures Add in here comments to the Photo: Photo #4 (Photo comments) CONSTRUCTION TECHNOLOGY CPCCBC5018A Medium Rise Structures Photo #5 CONSTRUCTION TECHNOLOGY CPCCBC5018A Medium Rise Structures Add in here comments to the Photo: Photo #5 (Photo comments) CONSTRUCTION TECHNOLOGY CPCCBC5018A Medium Rise Structures Photo #6 CONSTRUCTION TECHNOLOGY CPCCBC5018A Medium Rise Structures Add in here comments to the Photo: Photo #6 (Photo comments) CONSTRUCTION TECHNOLOGY CPCCBC5018A Medium Rise Structures Photo #7 CONSTRUCTION TECHNOLOGY CPCCBC5018A Medium Rise Structures Add in here comments to the Photo: Photo #7 (Photo comments) CONSTRUCTION TECHNOLOGY CPCCBC5018A Medium Rise Structures Photo #8 CONSTRUCTION TECHNOLOGY CPCCBC5018A Medium Rise Structures Add in here comments to the Photo: Photo #8 (Photo comments) CONSTRUCTION TECHNOLOGY CPCCBC5018A Medium Rise Structures Photo #9 CONSTRUCTION TECHNOLOGY CPCCBC5018A Medium Rise Structures Add in here comments to the Photo: Photo #9 (Photo comments) CONSTRUCTION TECHNOLOGY CPCCBC5018A Medium Rise Structures Photo #10 CONSTRUCTION TECHNOLOGY CPCCBC5018A Medium Rise Structures Add in here comments to the Photo: Photo #10 (Photo comments) CONSTRUCTION TECHNOLOGY CPCCBC5018A Medium Rise Structures Photo #11 (Your Photo here) CONSTRUCTION TECHNOLOGY CPCCBC5018A Medium Rise Structures Add in here comments to the Photo Photo #11 (Your Photo comments) CONSTRUCTION TECHNOLOGY CPCCBC5018A Medium Rise Structures Photo #12 (Your Photo here) CONSTRUCTION TECHNOLOGY CPCCBC5018A Medium Rise Structures Add in here comments to the Photo Photo #12 (Your Photo comments) r.o.w or w il s tre et reserve cricklewood avenue existing building proposed building EX. TREES & LANDSCAPING TO BE REMOVED EX. PLAYGROUND, SAND PIT & SHADE SAILS TO BE REMOVED PALING FENCE TO BE REMOVED EX. SHED TO BE REMOVED TUBULAR METAL FENCE TO BE REMOVED EX. CHAIN MESH GATES TO BE RELOCATED MODIFY EX. CHAIN MESH FENCE & FORM NEW OPENING FOR EX. CHAIN MESH GATES EX. BRICK PIER TO BE DEMOLISHED NEW FENCE CHAIN TO MATCH EXISTING EX. SHED RETAINED GENERAL NOTES . These drawings are to be read in conjunction with other drawings of the set. No variation is to be made to the drawing set without the prior approval of the Proprietor and/or Architect. . Builder to verify all dimensions before commencing work. All dimensions to be confirmed on site. This drawing is not to be scaled. . Ground levels indicated are approximate only and must be confirmed on site prior to commencement. . All materials constructions etc. are to comply with all relevant codes, by laws, Building Code of Australia, etc. . New construction to match existing where applicable. All new floors to be at same level as existing floors. . Foundations, excavations, reinforcement placement etc. to be inspected and approved by the building surveyor prior to any concrete placement. . New concrete work is to comply with the requirements of SAA code AS 3600 - 2001 and subsequent amendments - as applicable. . Structural framing to be in accordance with AS 1684 Timber Framing Code. . Stormwater to be connected to existing system to approval. . All glazing to be in accordance with AS 1288. . Electrical layout in accordance with the requirements of the local supply authority. . Soil classification confirmed: refer to soil test report. ARCHITECTURAL 16 Orwill Street, Frankston Orwil St Community House Redevelopment scale 1:400 (A3) Site Plan SCALE DATE DRAWN CHECKED FILE RELEVANT DRAWINGS FIGURED DIMENSIONS TAKE PREFERENCE ALL WORK SHALL CONFORM TO THE SPECIFICATION & OTHER THIS DRAWING IS PROTECTED BY COPYRIGHT APPROVAL BEFORE COMMENCEMENT OF ANY FABRICATION SHOP DRAWINGS SHALL BE SUBMITTED TO THE GHP OFFICE FOR OVER SCALED DIMENSIONS CHECK ALL DIMENSIONS ON SITE PROJECT DRAWING PROPRIETOR NOTES & ADDENDA As indicated 01. 2575_och_wd_site.dwg LEVEL 1, 464 VICTORIA STREET NORTH MELBOURNE VICTORIA 3051 AUSTRALIA Fax 0 3 9 3 2 8 1 6 9 1 Tel 0 3 9 3 2 9 2 6 1 1 Website www.ghp.biz E-mail [email protected] .Greenway Hirst Page Pty Ltd . . Urban Design Project Management Environmental Design Town & Regional Planning Architecture DATE REV 13.9.19 DETAIL A Tender Readiness Issue 20.11.19 BM NP JOB NO C2575 DRAWING NO WD01 REV COVER SHEET FRANKSTON CITY COUNCIL ORWIL ST COMMUNITY HOUSE REDEVELOPMENT HYDRAULIC ELECTRICAL MECHANICAL STRUCTURAL 16 ORWIL STREET, FRANKSTON VIC 3199 REFURBISHMENT WORKS TO EX.BUILDING NEW WORKS 02.10.19 B Tender Issue 20.11.19 C Tender Addendum + Coordination Revisions Issued for Construction ( Building Permit) AutoCAD SHX Text SEWER LINE AutoCAD SHX Text EX. CHAIN MESH FENCE AutoCAD SHX Text TITLE BOUNDARY AutoCAD SHX Text EX. BARREL DRAIN AutoCAD SHX Text SEP AutoCAD SHX Text LPD:SEP AutoCAD SHX Text SEWER LINE AutoCAD SHX Text DRIVEWAY AutoCAD SHX Text - AutoCAD SHX Text WD16 AutoCAD SHX Text GROUND FLOOR PLAN - AutoCAD SHX Text GROUND FLOOR PLAN SEWER AutoCAD SHX Text DEMO PLAN AutoCAD SHX Text SPECIFICATION - SHEET 3 AutoCAD SHX Text SPECIFICATION - SHEET 2 AutoCAD SHX Text SPECIFICATION - SHEET 1 AutoCAD SHX Text H03 AutoCAD SHX Text H02 AutoCAD SHX Text H01 AutoCAD SHX Text H04 AutoCAD SHX Text H05 AutoCAD SHX Text H06 AutoCAD SHX Text E01 AutoCAD SHX Text DRAWING,INDEX,LEGEND OF SYMBOLS AutoCAD SHX Text S05 AutoCAD SHX Text S04 AutoCAD SHX Text S03 AutoCAD SHX Text S01 AutoCAD SHX Text S02 AutoCAD SHX Text GENERAL NOTES 1 AutoCAD SHX Text GENERAL NOTES 3 AutoCAD SHX Text FOOTING PLAN AutoCAD SHX Text FIRST FLOOR FRAMING PLAN AutoCAD SHX Text INTERNAL ELEVATIONS 1 AutoCAD SHX Text SECTIONS 1 AutoCAD SHX Text PROPOSED ELEVATIONS 2 AutoCAD SHX Text PROPOSED ELEVATIONS 1 AutoCAD SHX Text PROPOSED ROOF PLAN AutoCAD SHX Text REFLECTED CEILING PLAN/ PLAN DETAILS AutoCAD SHX Text PROPOSED GROUND FLOOR PLAN AutoCAD SHX Text EXISTING CONDITIONS / DEMOLITION PLAN AutoCAD SHX Text COVER SHEET / SITE PLAN AutoCAD SHX Text WD-11 AutoCAD SHX Text WD-09 AutoCAD SHX Text WD-08 AutoCAD SHX Text WD-07 AutoCAD SHX Text WD-06 AutoCAD SHX Text WD-05 AutoCAD SHX Text WD-04 AutoCAD SHX Text WD-03 AutoCAD SHX Text WD-02 AutoCAD SHX Text WD-01 AutoCAD SHX Text INTERNAL ELEVATIONS 4 AutoCAD SHX Text INTERNAL ELEVATIONS 3 AutoCAD SHX Text INTERNAL ELEVATIONS 2 AutoCAD SHX Text WD-13 AutoCAD SHX Text WD-12 AutoCAD SHX Text INTERNAL ELEVATIONS 5 AutoCAD SHX Text WD-14 AutoCAD SHX Text DOOR / WINDOW SCHEDULE AutoCAD SHX Text WD-15 AutoCAD SHX Text DETAILS 1 AutoCAD SHX Text WD-10 AutoCAD SHX Text CONSTRUCTION ISSUE AutoCAD SHX Text EXTERNAL WORKS AutoCAD SHX Text WD-16 AutoCAD SHX Text GENERAL NOTES 2 AutoCAD SHX Text S06 AutoCAD SHX Text FOOTING DETAILS 1 AutoCAD SHX Text S07 AutoCAD SHX Text FOOTING DETAILS 2 AutoCAD SHX Text S08 AutoCAD SHX Text FRAMING DETAILS 1 AutoCAD SHX Text S09 AutoCAD SHX Text FRAMING DETAILS 2 AutoCAD SHX Text S10 AutoCAD SHX Text BRACING DETAILS AutoCAD SHX Text M03 AutoCAD SHX Text M01 AutoCAD SHX Text M02 AutoCAD SHX Text LEGEND OF SYMBOLS AutoCAD SHX Text FLOOR PLAN DUCTWORK AutoCAD SHX Text SPECIFICATIONS AutoCAD SHX Text & EQUIPMENT LAYOUT AutoCAD SHX Text AND SPECIFICATION AutoCAD SHX Text E02 AutoCAD SHX Text PROPOSED LIGHTING LAYOUT AutoCAD SHX Text E03 AutoCAD SHX Text POWER & COMMS LAYOUT AutoCAD SHX Text E04 AutoCAD SHX Text SCHEMATICS AutoCAD SHX Text ROOF PLAN - AutoCAD SHX Text H07 AutoCAD SHX Text & SCHEDULES AutoCAD SHX Text & STORMWATER LAYOUT AutoCAD SHX Text WATER LAYOUT AutoCAD SHX Text SEWER & STORMWATER LAYOUT foyer sitting kitchen office 1 office 2 acc wc ex.wc store 1 consult 3 consult 4 multi purpose 1 computer child care child wc store 2 child alcove r.o.w EX. SH ED TO BE RE TAI NE D PALING FENCE TO BE REMOVED TUBULAR METAL FENCE TO BE REMOVED EX. PLAYGROUND, SAND PIT & SHADE SAILS TO BE REMOVED EX. VERAND A & EXTERNA L SLAB TO BE REMOVED EX. CONC. RAMP TO BE REMOVED EX. TREES TO BE REMOVED EX.
Answered 8 days AfterJun 16, 2022

Answer To: Diploma Apply Structural Principles to Medium Rise CPCCBC508A: AT2 Portfolio Medium Rise - Drawings...

Amar Kumar answered on Jun 24 2022
92 Votes
Microsoft PowerPoint - Photo Review Option
Chisholm Tafe – Construction Technology
CPCCBC5018A - Apply structural principles to the construction of medium rise buildings
Photographic
Review
& Annotation
Assessment
CONSTRUCTION TECHNOLOGY
CPCCBC5018A Medium Rise Structures
· Identify the main structural principles in the following photo’s
· List any specific requirements that would need to be considered for demolition of each photo.
· Utilise these photo’s to aide in your reports for this unit.
· You are required to provide only two of your own Commercial Building Photos in any class from 2 to 9, if using this Review Document
· Ask questions if there is anything you don’t understand
CONSTRUCTION TECHNOLOGY
CPCCBC5018A Medium Rise Structures
Photo #1
CONSTRUCTION TECHNOLOGY
CPCCBC5018A Medium Rise Structures
foundation: A component of a structural system that anchors and supports a building's superstructure and transfers its loads to the ground. The bottom of the foundation needs to be below the frost level in order to protect it from repeated freeze-thaw cycles.
Photo #1 (Photo comments)
CONSTRUCTION TECHNOLOGY
CPCCBC5018A Medium Rise Structures
Photo #2
CONSTRUCTION TECHNOLOGY
CPCCBC5018A Medium Rise Structures
Screeds are long, rigid, straight tubes or boards that are used to approximately level and smooth wet concrete right after it has been poured. Screeds come in a variety of sizes and are sometimes even project-specific, like those used to construct concrete bridges. In order to ride over the top edges of the form as the concrete is flattened during hand-screeding, the screed must be longer than the width of the concrete form.
A straightforward straight piece of dimension timber, typically a 2 x 4, works as a screed for many smaller projects including sidewalks, slabs for garages and driveways, and patios. Commercial screeds are also available; they frequently take...
SOLUTION.PDF

Answer To This Question Is Available To Download

Related Questions & Answers

More Questions »

Submit New Assignment

Copy and Paste Your Assignment Here