Refer to the cross section shown in problem 14 in Chapter 6. If the channel has a uniform earth section lined with riprap and the slope is 3.00 percent, what are (a) the discharge and (b) the velocity?
Refer to the channel cross section shown in problem 7 in Chapter 6. Disregard the water level shown in the cross section, and find a new normal depth if the channel slope is 1.25 percent and the discharge is 300 cfs. The lining is concrete (trowel finish).
Already registered? Login
Not Account? Sign up
Enter your email address to reset your password
Back to Login? Click here