Rather than stop the production when a mean crosses the control limits in the-bar chart, a manager has decided to wait until two consecutive means lie outside the control limits before stopping the process. The control limits are at.
(a) By waiting for two consecutive sample means to lie outside the control limits, has the manager increased or decreased the chance for a Type I error?
(b) What is the probability of a Type I error if this procedure is used?
Already registered? Login
Not Account? Sign up
Enter your email address to reset your password
Back to Login? Click here