Question 1: You have been assigned to design primary clarifiers for a wastewater treatment plant. The average flow rate of the wastewater is XXXXXXXXXXm3/day with a BOD5 of 120 mg/L and suspended...

Question 1: You have been assigned to design primary clarifiers for a wastewater treatment plant. The average flow rate of the wastewater is 256000 m3/day with a BOD5 of 120 mg/L and suspended solids concentration of 300 mg/L. The goal is to remove 35% BOD5 and 60% suspended solids in primary treatment. Determine the following: 1) The diameter of the primary clarifier for a surface overflow rate of 50 m3/m2-day.2) The detention time in the primary clarifier and the mass of solids removed in kg/day.Assume a depth of 4m.
Question 1: You have been assigned<br>to design primary clarifiers for a<br>wastewater treatment plant. The<br>average flow rate of the wastewater<br>is 25000 m3/day with a BOD5 of 120<br>mg/L and suspended solids<br>concentration of 300 mg/L. The goal<br>is to remove 35% BOD5 and 60%<br>suspended solids in primary<br>treatment. Determine the following:<br>1) The diameter of the primary<br>clarifier for a surface overflow rate of<br>50 m3/m2-day.2) The detention time<br>in the primary clarifier and the mass<br>of solids removed in kg/day.Assume a<br>depth of 4m.<br>

Extracted text: Question 1: You have been assigned to design primary clarifiers for a wastewater treatment plant. The average flow rate of the wastewater is 25000 m3/day with a BOD5 of 120 mg/L and suspended solids concentration of 300 mg/L. The goal is to remove 35% BOD5 and 60% suspended solids in primary treatment. Determine the following: 1) The diameter of the primary clarifier for a surface overflow rate of 50 m3/m2-day.2) The detention time in the primary clarifier and the mass of solids removed in kg/day.Assume a depth of 4m.

Jun 11, 2022
SOLUTION.PDF

Get Answer To This Question