QUALITY MANAGEMENT PLAN FOR MARIBYRNONG COUNCIL REGARDING PAVEMENT CONSTRUCTION
Table of Contents
Executive Summary 4
Introduction 5
Scopes 5
Objectives 5
Purposes 5
Product Realization 6
Identification of Requirements 6
Product and Service provision 6
Design 6
Measuring and Test Equipment 7
Induction and Training 7
Purchasing or Supply by the RTA 8
Supply of Materials 8
Materials Schedule 8
Material Supplied by the Council 9
Material Supplied by the RTA 9
Identification and Traceability 9
Controlling services 10
Monitoring Sub-contractors 11
Control of the Services 12
Evaluation 12
Minor Defects 12
Nonconformance in Services 12
Handling & Delivery 13
Review 14
Reference List 15
Executive Summary
The quality management plan refers to a proper system of documenting process, procedure outlining and responsibility allocation for a particular project. The quality management plan helps in proper coordination between involved partners during a project. Quality management helps in better controlling of the processes, reducing defects, avoiding mistakes, proper training at the right time etc. Nowadays almost every major project starts with an official QMP.
Introduction
Scopes
This document is about the quality management process that will be followed by the construction council named Maribyrnong Council for pavement construction. This plan adheres to the RTA’s Contract Management Framework. It should be used in conjunction with other Contract Management Plans to create a proper project framework.
Objectives
Maribyrnong Council gives an assurance of the quality to its partners, this project will not be an exception to that. This report will discuss proper planning, product realizations, objectives, the RTA requirements, etc. in brief.
Purposes
The purposes of this Quality Management Plan are as follows.
· Provide guidance to the council stuffs on obligations by RMCC.
· Assurance of quality work as per pre-determined guidelines.
· Defining quality management requirements as per RMCC.
· Determining the to-do list in order to achieve a desirable end result.
Product Realization
Identification of Requirements
According to the RMCC, the requirements of a pavement construction project are determined by the following factors.
· Joint inspection and planning assessments for the parties involved to avoid any miscommunications during the process.
· Planning a proper inspection guideline to keep track of the progress and identifying the scopes of improvements (Begari, 2017).
· Carrying out inspections as per the inspection guideline plans to match with the RTA specifications.
Image 1: Pavement construction project
Product and Service provision
During the project, the following provisions should be prioritized to avoid complications in the end.
· Identification of defects properly.
· Repair work of the defects on an urgent basis.
· Recording the process and reporting the progress.
Design
All the designs and blueprints of the maintenance work of the pavement construction will be prepared by the Maribyrnong Council which should comply with the RMCC’s guidelines.
Measuring and Test Equipment
Various kinds of equipment are used in this kind of pavement construction job for inspection, measurements, testing, etc. All the required tools need to be arranged by the organization and it needs to be made sure that everything is calibrated and is in good condition (Fu et al, 2017). Proper usage of the right equipment ensures reliable performances and results.
Image 2: Laser scanner being used for pavement measurement
The project supervisor of Maribyrnong Council will be responsible for selecting the right measurement tools as per the requirements. While using the tool to take the measurements the team needs to be careful about the accuracy. Proper calibration should be done if needed.
If any item is dropped or displaced accidentally and if its calibration doesn’t feel right that tool needs to be marked as ‘NOT TO BE USED’ immediately. The same is applicable for any damaged equipment (Hu et al, 2021). The project supervisor will determine if the measurement data is enough or there is a need for re-assessment.
Induction and Training
The training supervisor of Maribyrnong Council will be required to prepare a project-specific induction and training plan. It needs to be conveyed that the project team must comply to the RTA's intervention levels, inspection procedures, safety, traffic control, environmental protection, and incident management standards during the training.
The training supervisor will need to ensure that all personnel engaged at the site have undergone an appropriate induction program which guarantees that everyone working on the project is on the same page. The same induction needs to be done for any sub-contractors under the council also (Keshk et al, 2018). The induction and training should focus on the individual...