Q.NO.4 Draw the load duration curve from given daily load cycle. Also find load factor, average load ,units generated per day and maximum demand . select the size and number of generating stations to...

Here X =165 plzzz solve urgent with detail...Q.NO.4 Draw the load duration curve from given daily load cycle. Also find load factor, average<br>load ,units generated per day and maximum demand . select the size and number of generating<br>stations to match the load curve.<br>Time<br>0-6<br>6–10<br>10 –12<br>12 –16<br>16–20<br>20 –24<br>(Hours)<br>Load (M W)<br>0.8x<br>1.1x<br>1.2x<br>1.1x<br>1.3x<br>X<br>

Extracted text: Q.NO.4 Draw the load duration curve from given daily load cycle. Also find load factor, average load ,units generated per day and maximum demand . select the size and number of generating stations to match the load curve. Time 0-6 6–10 10 –12 12 –16 16–20 20 –24 (Hours) Load (M W) 0.8x 1.1x 1.2x 1.1x 1.3x X

Jun 10, 2022
SOLUTION.PDF

Get Answer To This Question

Related Questions & Answers

More Questions »

Submit New Assignment

Copy and Paste Your Assignment Here