Q3. Write down the steps to carry out a Total Station Survey right from getting the instrument issued from the survey lab to following measurements. 1. Vertical angle between bottom and top of a...

B6Q3. Write down the steps to carry out a Total Station Survey right<br>from getting the instrument issued from the survey lab to<br>following measurements.<br>1. Vertical angle between bottom and top of a building<br>2. Distances AB, BC and CD. Starting point of the survey is B.<br>

Extracted text: Q3. Write down the steps to carry out a Total Station Survey right from getting the instrument issued from the survey lab to following measurements. 1. Vertical angle between bottom and top of a building 2. Distances AB, BC and CD. Starting point of the survey is B.