Q3. A new 187 MW hydropower station is to be built at a site where the available head is estimated at 307 m. The generators require the turbine to rotate at 17 rad/sec. The only available turbines are...









Q3. A new 187 MW hydropower station is to be built at a site where the available head is estimated at 307 m. The generators require the turbine to rotate at 17 rad/sec. The only available turbines are Francis turbines with KN (the non-dimensional parameter to classify turbine ) equal to 0.07 .


Determine  the number of turbines required.


Jun 11, 2022
SOLUTION.PDF

Get Answer To This Question

Related Questions & Answers

More Questions »

Submit New Assignment

Copy and Paste Your Assignment Here