Extracted text: Q2: For the system shown below, find the minimum flow rate of the jet from the orifice at the end of the pipeline (at point A) to cross the wall and minimum pump head (Hp) that required to maintain the required minimum head (hme) required to discharge this flow rate. Take Z1 between O to 10 m , 2 from O to 9 m and Cv-0.85. Total Energy line 3.5 m z1 d= Somm 22 2.0 m Concrete wall Solution: