Public Service Indiana (PSI) is considering five possible locations to build power plants during the next 20 years. It will cost c i dollars to build a plant at site i and h i dollars to operate a...

1 answer below »

Public Service Indiana (PSI) is considering five possible locations to build power plants during the next 20 years. It will cost ci dollars to build a plant at site i and hi dollars to operate a site i plant for a year. A plant at site i can supply ki kilowatthours (kwh) of generating capacity. During year t, dt kwh of generating capacity are required. Suppose that at most one plant can be built during a year, and if it is decided to build a plant at site i during year t, then the site i plant can be used to meet the year t (and later) generating requirements. Initially, PSI has 500,000 kwh of generating capacity available.


Formulate a recursion that PSI could use to minimize the sum of building and operating costs during the next 20 years.



Answered Same DayDec 24, 2021

Answer To: Public Service Indiana (PSI) is considering five possible locations to build power plants during the...

Robert answered on Dec 24 2021
128 Votes