Problem • What is the total area required by a city of stable population of 350,000 to provide ten years of landfill disposal capacity for MSW generated by this population. The studies showed that the...

السلام عليكم اريد حل هذا محتاجته ضروريProblem<br>• What is the total area required by a city of stable population of<br>350,000 to provide ten years of landfill disposal capacity for<br>MSW generated by this population. The studies showed that the<br>generation rate in this city is 4.4 Ib person day and the design of<br>the landfill can be 50 ft average depth. The in place density of<br>the waste will be 950 Ib yd. The auxiliary facilities (buildings.<br>roads, equipment, maintenance, storage, etc) will account for<br>50°% of the actual site area. (27 ft 1 yd').<br>• If a recycling program was initiated in the city, and expected to<br>reduce the disposed solid waste by 25 (by weight), what is the<br>extended life years for the landfill.<br>64<br>

Extracted text: Problem • What is the total area required by a city of stable population of 350,000 to provide ten years of landfill disposal capacity for MSW generated by this population. The studies showed that the generation rate in this city is 4.4 Ib person day and the design of the landfill can be 50 ft average depth. The in place density of the waste will be 950 Ib yd. The auxiliary facilities (buildings. roads, equipment, maintenance, storage, etc) will account for 50°% of the actual site area. (27 ft 1 yd'). • If a recycling program was initiated in the city, and expected to reduce the disposed solid waste by 25 (by weight), what is the extended life years for the landfill. 64

Jun 11, 2022
SOLUTION.PDF

Get Answer To This Question

Related Questions & Answers