One of two alternatives will be selected to reduceflood damage in a rural community in centralArizona. The estimates associated with each alternativeare available. Use B/C analysis at a discount rateof 8% per year over a 20-year study period to determinewhich alternative should be selected. For analysispurposes only, assume the flood damage wouldbe prevented in years 3, 9, and 18 of the study period.Retention Pond ChannelInitial cost, $ 880,000 2,900,000Annual maintenance, $/year 92,000 30,000Reduced flood damage, $ 200,000 600,000
Already registered? Login
Not Account? Sign up
Enter your email address to reset your password
Back to Login? Click here