Name of Budgeted Cost Budgeted Cost Plant insurance $ 86,100 Testing raw materials 45,000 Manufacturing equipment setup 7,200 Quality inspections 57,000 Property taxes 23,000 Electricity, plant 14,000...




















































































Name of Budgeted CostBudgeted Cost
Plant insurance$86,100
Testing raw materials45,000
Manufacturing equipment setup7,200
Quality inspections57,000
Property taxes23,000
Electricity, plant14,000
Electricity, manufacturing equipment51,250
Depreciation, plant18,800
Depreciation, manufacturing equipment36,700
Maintenance worker (manufacturing equipment)22,500
Indirect labor (manufacturing equipment setup)8,300
Design engineering220,000


Required:
1.
Assign each of the budgeted costs above to one of the following activity cost pools:



  • Engineering

  • Equipment setup

  • Quality control

  • Factory facilities

  • Manufacturing equipment




2.
Compute the total cost of each pool.



3.
Indicate whether the activities in each pool are unit, batch, product, or facility level.



4.
Identify the most likely driver for each cost pool from the following list:



  • Number of inspections/tests

  • Square feet

  • Machine hours

  • Engineering hours

  • Number of setups



Use the following table to organize your answer. The engineering cost pool is done as an example. Other pools may have more than one cost item included.


How would i fill out the table?


Total Cost of<br>Рool<br>3. Unit, Batch,<br>Product, or Facility<br>2.<br>Activity Cost Pool<br>1.<br>Costs Included in Pool<br>4.<br>Cost Driver<br>Design engineering<br>Engineering<br>$<br>220,000 Product<br>Engineering Hours<br>Equipment Setup<br>Quality Control<br>Factory Facilities<br>Manufacturing Equipment<br>

Extracted text: Total Cost of Рool 3. Unit, Batch, Product, or Facility 2. Activity Cost Pool 1. Costs Included in Pool 4. Cost Driver Design engineering Engineering $ 220,000 Product Engineering Hours Equipment Setup Quality Control Factory Facilities Manufacturing Equipment