Managing Testing Process Assignment Detail how you would develop a test schedule. Instructions to the Participant Read the scenario below, and provide a detailed response as to how you will handle or...

1 answer below »
See the attached file


Managing Testing Process Assignment Detail how you would develop a test schedule. Instructions to the Participant Read the scenario below, and provide a detailed response as to how you will handle or resolve the situation within the scenario based on your knowledge and skills. 500 words. You are the administrator of a windows server 2008 system. You have just received delivery of a new server that will perform print and file services on your network and want to ensure that the server performs to the specification set out by the systems designer. You plan to test the server before it goes into production to baseline it and then test the server when it is in production at various times of the day to measure the load. You need to make considerations for the following constraints... • How to determine the testing requirements • Incorporating your test with an existing test plan • Timeline • Documentation – what type – who are the stakeholders • What to do with the results
Answered Same DayAug 07, 2021

Answer To: Managing Testing Process Assignment Detail how you would develop a test schedule. Instructions to...

Himanshu answered on Aug 08 2021
147 Votes
Test Schedule Development
In the given scenario admin has given a server that’s main task is to per
form file and print services. So admin need to develop a test schedule to test the server on the network. Admin have to develop the test schedule keeping things in mind like:
1. Determining the testing requirements:
In this phase admin need to determine what type of server he is going to test on. In this case admin is given a server that is responsible for file and print services. A file server concerns about the sharing file with the authorized client. Admin needs to concern about which client has which access right. Admin also needs to test if server is performing all the print operations correctly.
2. Incorporating test with existing test plan:
For each and every server before going into the installation phase...