Introduction CP5631 Assignment - Networking Case Study Introduction This case study has been divided into five components. You are to design a network, research and source appropriate devices...

2 answer below »
Please find attached


Introduction CP5631 Assignment - Networking Case Study Introduction This case study has been divided into five components. You are to design a network, research and source appropriate devices justifying choices (feasibility, efficiency, etc.), subnet the network, assign IP addresses to the appropriate devices, and write an executive summary for the project. You will also be required to prepare proposal to use cloud computing, taking into security, performance and cost. Note: This is not a group project. Each student must individually complete all parts of their submission. Students must start with a new document and they must not have another person’s file in their possession at any time. Students may discuss the task with each other, but each student must write their assignment independently and not show their work to other students. Deliverables 1. A single Word document (.docx) – containing all parts Assignment breakdown Scenario A major Australian data analytics company has asked you to assess and redesign their network. They are opening new branches in San Francisco and Osaka, which will require new equipment. They have existing contracts and hardware to maintain fibre optic leased line WAN links between sites. PART 1 - Executive summary PART 2 - Network diagram PART 3 - Subnet the network and assign IP addresses to the appropriate devices PART 4 - Research and source appropriate devices justifying choices (feasibility, efficiency, etc.) with a Weighted Scoring Model (WSM) PART 5 - Cloud computing proposal PART 1 - Executive summary Describe the purpose, scope, and objectives of the project for each of parts 2, 3 and 4. Why is it important to produce a well-designed network diagram? What goals are you trying to achieve with the hardware you select for the procurement project? · Purpose The first thing you need to do when starting on a project is ask “why”? What problem are you trying to solve? Once you explicitly define the problem, it becomes easier to evaluate possible solutions. · Scope A project’s scope defines the outputs or deliverables of a project. What is the overall outcome of the project? How will the output of the project solve the problem? What features will the end result have? · Objectives The objectives are areas of focus of the project, and can be listed as discrete goals. Projects are usually constrained by an overall budget and time-frame. Objectives can break down the overall constraints of the project and apply them to individual aspects. Typically, good objectives follow the SMART principle, in that goals must be: · Specific – well-defined and clear output · Measurable – You know when the goal has been accomplished, or how much progress has been made · Attainable – Goals are realistic and can be achieved within the project’s constraints · Relevant – The goals are worthwhile and make sense in the context of the project · Time-bound – Goals should have a time limit The executive summary should be well-articulated: clear, concise, and use correct spelling and grammar. The intended audience for the executive summary can be assumed to have basic technical knowledge, but are not networking experts. You should aim for 200 to 300 words. PART 2 - Network specifications and diagram Network Specifications You have been given a rough sketch of the network topology below. You are to draw the network using Visio, subnet the network (see part 3), and assign port numbers and IP addresses to ports. Network Structure Hardware · Only include one switch in you diagram for each LAN or WLAN (even if more are required) · The Internet router port address is 104.200.16.26/30 · The Seoul router is connected to the Internet, and provides access to the public backbone containing a web server and a database server. PART 3 - Subnet the network using VLSM, and assign IP addresses to the appropriate devices. Each location has the following number of hosts Seoul, Seattle, and San Francisco (the cities that start with S) each include a wireless LAN for clients to use. Location Workstations WLAN addresses Seoul 400 30 Seattle 70 14 San Francisco 150 14 Osaka 50 Hong Kong 80 Vancouver 15 Subnetting Use VLSM to subnet the network topology using a public class B network. You are to use the table format below to provide the subnet details. Table 1. Subnets (including WAN subnets) Spreadsheet Columns: Subnet name, subnet address, subnet mask (in slash format), first useable address, last useable address, broadcast address, static address range and DHCP address range (all addresses to be in dotted decimal notation) Table 2. Router Interfaces Spreadsheet Columns: Location, interface, IP address, subnet mask (in slash format) Table 3. Servers Spreadsheet Columns: Location, server name, IP address, subnet mask (in slash format) Additional requirements: · Choose one public B class network address for the entire network and subnet this block of addresses to optimise spare addresses for future expansion. · Place the WAN subnets in the blocks directly following the LAN address space. · Add 100% to each subnet to allow for growth in the number of hosts specified for each LAN (i.e. workstations × 2). Do not allow for any growth in the number of servers or size of WLANs · DHCP will to be used for IP address allocation for hosts in each subnet and these ranges are to be allocated for each LAN. · Static IP addresses are to be allocated where appropriate. · The ISP has given us an IP address of 104.200.16.26/30 for our Internet connection at Seoul. PART 4 - Research and source appropriate devices justifying choices (feasibility, efficiency, etc.) You are to research and submit a project procurement plan for the San Francisco networks. The devices you must include are routers, switches, and wireless access points. Make sure the devices you select can handle the number of workstations required at the site, and provide a good quality of service to wired and wireless users. Your project plan and final recommendations should be based on a Weighted Decision Matrix (similar to the WDM you did in the Procurement Practical). You are to compare five (5) devices from each category and to base the decision on reasonable and well-justified attributes. The budget for all procurement is $10,000. You may exceed this if you can justify it well. Your project plan is to contain the following components: Executive summary · Briefly describe the goals of the procurement plan Weighted Decision Matrix - hardware resource requirements analysis · Include a written justification for priorities and attributes given in the matrix · Create your WDMs in Excel and copy and paste them into your Word doc Budget · Create a well-presented table of the prices of all devices and the total cost · Include hardware only, not labour PART 5 – Cloud computing proposal You have been asked to prepare a proposal about how cloud computing could be used to reduce the company’s hardware, service, and energy costs. You are to consider the following three scenarios, and make a recommendation on which to choose: 1. Replacing ALL workstations within the organisation with thin clients, which will access a desktop environment provided by a cloud service provider (e.g., Amazon or Alibaba). 2. Replacing ALL workstations within the organisation with thin clients, which will access a desktop environment provided by a private cloud infrastructure, created in-house and based in Seoul. 3. Continuing to use workstations. The company’s current contract is $850 per workstation, per year, for hardware and service. On average, each workstation currently consumes 230 kWh per year of electricity. In making your recommendation, you should consider not just costs, but the security implications of moving to a cloud service. Your proposal should not exceed 2000 words. You must provide citations for any references that you use. Page 6 of 9 Marking Scheme Ensure that you follow the processes and guidelines taught in class to produce high quality work. This assessment rubric provides you with the characteristics of exemplary, good, satisfactory, and unacceptable work in relation to task criteria Criteria Exemplary 100% Good 80% Satisfactory 60% Limited 40% Very Limited 20% Absent 0% Part 1 Executive Summary Purpose, Scope, and Objectives /15 Consistently logical and relevant articulation of the purpose, scope, and objectives of the project. Suitable for a semi-technical audience. Generally logical and relevant purpose, scope, and objectives of the project, aimed at a semi-technical audience. Generally suitable for a semi-technical audience. Presents reasonable articulation of the purpose, scope, and objectives of the project. Provides basic articulation of purpose, scope, or objectives. Executive summary contains some relevant articulation of purpose, scope or objectives. Incomprehensible executive summary, negligible attempt, or not done. Quality of Writing /5 1. Well-structured into paragraphs. 2. Correct grammar. 3. Correct spelling. Most of the criteria are satisfactory (See criteria under "exemplary") but some minor issues. Over half of the criteria are satisfactory (See criteria under "exemplary") but some minor issues. Under half of the criteria are satisfactory (See criteria under "exemplary") or significant issues in some areas. Attempt at executive summary, but contains many significant issues with grammar, spelling. Negligible attempt or not done. Part 2 Topology Design Diagram appearance /10 1. Created in MS Visio using Cisco icon set, and the diagram is: 2. Neat and Professional 3. All lines at set angles (multiples of 30, 45, 90 degrees) 4. Lines do not end short 5. Lines do not appear over the top of devices 6. Lines align if on same level Most of the criteria are satisfactory (See criteria under "exemplary") but some minor issues. Over half of the criteria are satisfactory (See criteria under "exemplary") but some minor issues. Under half of the criteria are satisfactory (See criteria under "exemplary") or significant issues in some areas. Many problems (e.g. not done in Visio, inconsistent formatting, diagram does not align to subnetting scheme, etc). Negligible attempt or not done. Diagram Labels and Devices /10 Topology is accurate and the diagram 1. Includes device names 2. Interface names 3. Interface IP addresses 4. Masks in slash format 5. Text neatly placed and sized Most of the criteria are satisfactory (See criteria under "exemplary") but some minor issues. Over half of the criteria are satisfactory (See criteria under "exemplary") but some minor issues. Under half of the criteria are satisfactory (See criteria under "exemplary") or significant issues in some areas. Many problems (e.g. topology is inaccurate; devices are not named, etc). Negligible attempt or not done. Part 3 Subnetting Scheme /10 1. LANs and WLANs are the correct size. 2. All required LANs and WLANs are documented. 3. WANs are the correct size. 4. All required WANs are documented. Most of the
Answered Same DaySep 15, 2020CP5631

Answer To: Introduction CP5631 Assignment - Networking Case Study Introduction This case study has been divided...

Gaurav answered on Sep 19 2020
149 Votes
SOLUTION.PDF

Answer To This Question Is Available To Download

Related Questions & Answers

More Questions »

Submit New Assignment

Copy and Paste Your Assignment Here