In the example used to demonstrate model construction in this chapter (p. 4), a firm sells a prod- uct,x, for $20 that costs $5 to make, it has 100 pounds of steel to make the product, and it takes 4 pounds of steel to make each unit. The model that was constructed is
maximizeZ= 20x- 5xsubject to
4x= 100
Now suppose that there is a second product,y, that has a profit of $10 and requires 2 pounds of steel to make, such that the model becomes
maximizeZ= 15x+ 10ysubject to
4x+ 2y= 100