In Exercise 1.3, a set of 30,000-foot-level operational metrics was created that was aligned with the satellite-level metrics described in Exercise 1.1 and the strategic plan that is described in...


In Exercise 1.3, a set of 30,000-foot-level operational metrics was created that was aligned with the satellite-level metrics described in Exercise 1.1 and the strategic plan that is described in Exercise 1.2. Describe a plan to track one of these operational metrics over time. Consider the frequency of reporting and how the capability of the process will be described.