In Exercise 1.3, a set of 30,000-foot-level operational metrics was created that was aligned with the satellite-level metrics described in Exercise 1.1 and the strategic plan that is described in Exercise 1.2. Describe a plan to track one of these operational metrics over time. Consider the frequency of reporting and how the capability of the process will be described.
Already registered? Login
Not Account? Sign up
Enter your email address to reset your password
Back to Login? Click here