If usage rate is 0.950 tonne per day, lead time is 5 days and the safety level of stock is maintained for 5 days, find out the re-order point.
If annual consumption of raw material is 1100 units. Order cost is Rs 150 per order. Find the carrying cost per unit, if the EOQ is 40.62 units.