HRMT20024 T XXXXXXXXXXAssessment 3 guidelines – Essay on Attracting and Retaining staff Due date Review/Exam Week, Monday, 8th Oct. 2018, 5.00PM Any requests for extension must be submitted through...

1 answer below »
my sector is on construction


HRMT20024 T2 2018 - Assessment 3 guidelines – Essay on Attracting and Retaining staff Due date Review/Exam Week, Monday, 8th Oct. 2018, 5.00PM Any requests for extension must be submitted through the CQU system at least 48 hours prior to the due date, with relevant supporting documents. Late submissions without approval will result in a penalty of 5% (2.25 marks) per day. Weighting 45% Length 2,500 words ± 10% (excluding title page and reference list) Learning outcomes 1, 2, 3, 4 Purpose Students have completed an annotated bibliography for Assessment 2, and that material should be used towards Assessment 3. Assessment 3 will assist students to apply their learning to a particular industry sector, and tailor their argument to that sector’s specific challenges. It will give students the opportunity to enhance their research, analysis, critical thinking and written communication skills; particularly in the areas of argument development and essay writing. Before starting this assessment, please read the marking criteria (at the end of this document). Assessment Task For Assessment 2, you selected a sector to study (e.g. agriculture; construction; financial services; health care; hospitality; manufacturing; mining; retail; transport). You will write an essay on the key challenges in attracting and retaining a workforce in your selected sector. Your essay will draw on at least five themes from Week 1 to Week 11 of this unit, being those most relevant to your selected industry sector. Your essay will draw on the academic literature (including the annotated bibliography you developed for Assessment 2), and develop an argument applying that literature to your selected sector. You must cite at least ten (10) relevant peer reviewed journal articles, and 3 chapters from the Kramar textbook. You can cite other academic references such as books, conference papers, and book chapters but these will NOT be counted as part of the 10 journal articles. Referencing APA referencing. For more information, see : https://www.cqu.edu.au/?a=14033 Submitting All assessments must be submitted through the Moodle site. No email submissions will be accepted. All assessments submitted electronically through Moodle must be through the Student Portal http://my.cqu.edu.au • Failure to submit electronically will be taken as a failure to submit and therefore a zero (0) score will apply to the specific assessment. https://www.cqu.edu.au/?a=14033 http://my.cqu.edu.au/ Plagiarism Copy detection software (TurnitIn) is used in this course and work found in contravention of the copying and plagiarism rules will be investigated. Penalties apply in the case of proven instances of copying, plagiarism and academic dishonesty. Please check the following links to know more about TurnitIn: http://turnitin.com/en_us/training/student-training/viewing-originality-reports http://turnitin.com/en_us/training/student-training/about-originalitycheck TurnitIn is only a tool and judgement needs to be used when you view your Originality Report. TurnitIn does not make a judgement as to what is referenced properly, it highlights the non-original material in a piece of work. You should use the similarity score as a guide only and must then check the originality report to determine whether or not changes need to be made to the assessment. Required Students must familiarise themselves with the following policies and procedures at http://policy.cqu.edu.au: Assessment of Coursework Policy; Assessment of Coursework Principles; Assessment of Coursework Procedures http://turnitin.com/en_us/training/student-training/viewing-originality-reports http://turnitin.com/en_us/training/student-training/viewing-originality-reports http://turnitin.com/en_us/training/student-training/about-originalitycheck http://policy.cqu.edu.au/ HRMT20024 Assessment 3 Rubric – Essay Key Criteria Exceeds Expectations (High Distinction) 85-100% Exceeds Expectations (Distinction) 75 - 84% Meets Expectations (Credit) 65 – 74% Meets Expectations (Pass) 50 – 64% Below Expectations (Fail) below 50% Content Knowledge 40% Demonstrates a balanced and very high level of detailed knowledge of core concepts by providing a very high level of analysis. Demonstrates a balanced and high level of knowledge of core concepts by providing a high level of analysis. Demonstrates a good level of knowledge of some of the core concepts by providing some level of analysis. Demonstrates limited knowledge of core concepts by providing a limited level of analysis. Demonstrates little, if any, knowledge of the core concepts with extremely limited, if any, analysis. Utilises more than 10 excellent, relevant and credible sources. Utilises more than 10 very good, relevant and credible sources. Utilises 10 current, relevant and credible sources. Utilises 10 mostly relevant and credible sources. Does not meet the requirement, in terms of quantity or quality of articles selected Argument 30% Excellent introduction; providing a very clear purpose which ensures all areas relevant to the topic are clearly outlined. Good introduction; providing a mostly clear purpose which ensures most areas relevant to the topic are clearly outlined. Fair introduction, addresses some points, lacks some detail; ensures some areas relevant to the topic are outlined. Poor introduction; addresses limited points, lacks detail; of which few areas are outlined. Very poor or non-existent introduction. Excellent and logical argument integrated throughout the work Strong argument throughout most of the work Some argument linking ideas throughout the work Weak argument Little or no argument The assessment presents a detailed and focused summary of the ideas presented; drawing clear and well thought-out conclusions. The assessment presents a fairly detailed and focused summary of the ideas presented; drawing fairly clear and well thought-out conclusions. The assessment presents a somewhat detailed and focused summary of the ideas presented; providing some evidence of conclusions. The assessment provides limited detail with no clear summary of the ideas presented; drawing limited conclusions. The assessment fails to provide any clear evidence of the ideas presented; drawing no clear conclusions. Organisation or structure 15% The ideas are arranged in an extremely logical, structured and coherent manner. The ideas are arranged in a fairly logical, structured and coherent manner. The ideas are arranged in a logical, some-what structured and coherent manner. The ideas appear less logical, structured and presents in fairly incoherent manner. There is little, if any, coherent structure to the document. Presentation and quality of writing 15% Quality of writing at a very high standard. Paragraphs are coherently connected to each other. Correct grammar, spelling and punctuation. Quality of writing is of a high standard. Paragraphs are mostly well structured. Few grammar, spelling and punctuation mistakes. Quality of writing is of a good standard. Few grammar, spelling and punctuation mistakes. Some problems with sentence structure and presentation Frequent grammar, punctuation and spelling mistakes. Use of inappropriate language. Quality of writing is at a very poor standard so barely understandable. Many spelling mistakes. Little or no evidence of proof reading. Late assessment penalty 5% per day x 45 marks = 2.25 marks per day
Answered Same DayOct 03, 2020HRMT20024Central Queensland University

Answer To: HRMT20024 T XXXXXXXXXXAssessment 3 guidelines – Essay on Attracting and Retaining staff Due date...

Sundeep answered on Oct 05 2020
150 Votes
4
Student Name:
Course ID:
Assessor Name:
Submission Date:
Table of contents
Introduction----------------------------------------------------------------------------- 3
Types of Construction------------------------------------------------------------------5
Company Culture and Employee Perceptions------------------------------------ 7
Managers and Supervisors------------------------------------------------------------ 9
Clarity, Communication and Transparency---------------------------------------11
Conclusion------------------------
---------------------------------------------------------12
References---------------------------------------------------------------------------------13
Introduction
Core objective of a procurement system is identifying responsibilities and task for of each and every participant in a signed project.( Stanford, M.S. and Molenaar, K.R., 2017)
The choice of the method of construction is one of the most important factors for the success of the project. Analysing requirement and characteristics of procurement system is very vital. There are many methods and techniques for the construction process but we need to understand the important components in the construction methodology. We need to understand the necessary ingredients and the positives and the negatives of each process. This report discusses 3 different types of procurement in the construction industry and also levels out the positives and the negatives of the processes. It also explains which method is useful for the success factor of what kind of construction. (Stanford, M.S. and Molenaar, K.R., 2017) Construction professionals are always keen to understand about procurement methods practiced in industry. The main types of procurement in the construction business are:
· Construction management
· General Contracting
· Design and Build
· Management Contracting
The other types of procurement methods which are working are given in the table below. This table specifies the function of the method and who is the active participant in each stage of the process
Construction is a business in which we have to find quality talent. Finding quality talent and then retaining them is one of the tasks that is severe in nature. The growth of the construction sector requires new and quality workers to be retained and trained in multiple activities so that the workers can participate in multiple tasks and the output from each worker can be increased. Employee retention is one of the main concerns in this industry and the cost of employee retention has been increasing with time.( Chang-Richards, A. Y., Wilkinson, S., Seville, E., & Brunsdon, D. (2016).)
The things that can affect the employee retention in a construction company are:
· Company Culture and Employee Perceptions
· Managers and Supervisors
· Clarity, Transparency and Communication
There are multiple other factors in the employee retention criteria such as pay, number of hours of working etc which shall be discussed in the later part of the report.
Types of Construction
Construction Management:
Construction Management is one of the main methods of procurement in which the work to be done is constructed by a number of different trade contractors. There is one construction manager who is incharge of the trade contractors. The manager is the one who directs the way the things are controlled. The client is the one who appoints the trade manager and the trade manager works as the agent for the client and administers and coordinates the working of the contracts.( Naoum, S. and Egbu, C., 2015) The construction manager is the one who has a lot of experience in the construction business and the knowledge of the construction manager can be used in this case to better guide the construction workers. The contract manager is included in the design stage in order to make him/her understand the project from scratch.( Fellows, Richard F., and Anita MM Liu, 2015)
General Contracting:
The traditional procurement method in the construction business is known as general contracting. The design of the thing that is to be made is given by the employer and the contractor has the responsibility to complete the task. The price of the contract is often based on the bill of quantities that are supposed to be required in the work which is given by the contractor. This method of procurement and construction is one of the oldest methods of construction and each and every construction worker is aware of this methodology. There are some times where the contractor is the one who prices the work to be done. An example of this is the things that are made from drawings. (Hughes, W., Champion, R. and Murdoch, J., 2015)
Design and Build:
This is a methodology in which the contractor takes up the job of both designing and also constructing. The employer gives the requirements and it is the job of the contractor and the sub contractor which is a part of the team to design the project and give the costing. A new type of design and build contracting is known as the turn key contracting in which the employer gives the requirements which are completed by the contractor in such a way that the owner just receives the turn key at the end of the project. This is known as Turn-Key contracting. The owner of the project has to just turn the key to get the results. Turnkey contracts are typically associated with process or power plants or works with a heavy engineering element and tend to be...
SOLUTION.PDF

Answer To This Question Is Available To Download

Related Questions & Answers

More Questions »

Submit New Assignment