Homework : Tabulated below are the flow on a stream drainage area 104 km. Find the depth of direct run off using the base flow separation (method 2). Time (hrs) (June 10) 2 4 Flow m'/s 16 15 6. 14.2...


Homework : Tabulated below are the flow on a stream drainage area 104 km.<br>Find the depth of direct run off using the base flow separation (method 2).<br>Time (hrs)<br>(June 10) 2<br>4<br>Flow m'/s<br>16<br>15<br>6.<br>14.2<br>158.5<br>10<br>260<br>12<br>286<br>221<br>14<br>16<br>186<br>18<br>157<br>20<br>133<br>22<br>113<br>24<br>93<br>(June 11) 2<br>76.4<br>4<br>65<br>55.2<br>46.7<br>10<br>12<br>39.6<br>34<br>14<br>28.3<br>22.7<br>21.5<br>20.6<br>19.9<br>16<br>18<br>20<br>22<br>24<br>19.2<br>

Extracted text: Homework : Tabulated below are the flow on a stream drainage area 104 km. Find the depth of direct run off using the base flow separation (method 2). Time (hrs) (June 10) 2 4 Flow m'/s 16 15 6. 14.2 158.5 10 260 12 286 221 14 16 186 18 157 20 133 22 113 24 93 (June 11) 2 76.4 4 65 55.2 46.7 10 12 39.6 34 14 28.3 22.7 21.5 20.6 19.9 16 18 20 22 24 19.2

Jun 10, 2022
SOLUTION.PDF

Get Answer To This Question

Related Questions & Answers