Electric power is to be generated by installing a hydraulic turbine-generator at a site 89 m below the free surface of a large water reservoir that can supply water at a rate of 1.500kg/s steadily. If...


Electric power is to be generated by installing a hydraulic turbine-generator at a site 89 m below the free surface of a<br>large water reservoir that can supply water at a rate of 1.500kg/s steadily. If the mechanical power output of the turbine is<br>870 kW and the electric power generation is 775 kW, determine the input power to the turbine in kW. Negiect losses in<br>the pipes. Use g =9.81 (m/s2).<br>Round the answer close to the integer number without fraction or decimal point<br>

Extracted text: Electric power is to be generated by installing a hydraulic turbine-generator at a site 89 m below the free surface of a large water reservoir that can supply water at a rate of 1.500kg/s steadily. If the mechanical power output of the turbine is 870 kW and the electric power generation is 775 kW, determine the input power to the turbine in kW. Negiect losses in the pipes. Use g =9.81 (m/s2). Round the answer close to the integer number without fraction or decimal point

Jun 11, 2022
SOLUTION.PDF

Get Answer To This Question

Related Questions & Answers

More Questions »

Submit New Assignment

Copy and Paste Your Assignment Here