Draw a flow net for the weir shown in Figure B, then calculate the rate of seepage under the weir. In addition, evaluate the exit gradient in the first flow channel of the last field against the...


Draw a flow net for the weir shown in Figure B, then calculate the rate of seepage under the<br>weir. In addition, evaluate the exit gradient in the first flow channel of the last field against<br>the critical gradient. Assume e = 0.60, and G, = 2.60,<br>37 m<br>10 m<br>1.5 m<br>3 m<br>9 m<br>Sheet pile<br>24 m<br>k = 1 x 10-3cm/sec<br>Impermeable Layer<br>

Extracted text: Draw a flow net for the weir shown in Figure B, then calculate the rate of seepage under the weir. In addition, evaluate the exit gradient in the first flow channel of the last field against the critical gradient. Assume e = 0.60, and G, = 2.60, 37 m 10 m 1.5 m 3 m 9 m Sheet pile 24 m k = 1 x 10-3cm/sec Impermeable Layer