Design an open-cut detention basin for the developed tract shown in Figure 15-23 to result in zero increase in peak runoff for the 100-year storm.
Computations are to be done by NRCS Method by computer or by hand. Locate the basin on site south of the parking area and discharge at one of the on-site streams. Make all slopes 3 horizontal to 1 vertical. Use the following assumptions:
1. Project location: near St. Paul, Minnesota
2. Hydrologic soil group B
3. Predevelopment soil cover on site: wooded, good condition
4. Postdevelopment soil cover on site:
Impervious
Lawns, good condition
Woods, fair condition