Copy and Write a particular specification for a cut-to-fill earthworks operation for a large sports field. Use the SABS 1200 format. You will have to establish realistic values for the density...

1 answer below »
Copy and

Write a particular specification for a cut-to-fill earthworks operation for a large sports


field. Use the SABS 1200 format. You will have to establish realistic values for the


density requirement of the fill, quality requirements and tolerances, method of payment


and sufficient pay items. Use SABS 1200 DA as a guide.


Assume that the ground conditions are unknown and could include rock, hard and soft


materials. Also assume that the size of the sports field is not known as the Client has


not yet decided if he needs a field for soccer, rugby, cricket or hockey, or all four. Note


that the project specification will include a geotechnical report and a series of drawings


giving all dimensions, slopes, etc.paste your question here...



Answered Same DayDec 24, 2021

Answer To: Copy and Write a particular specification for a cut-to-fill earthworks operation for a large sports...

David answered on Dec 24 2021
128 Votes
OBJECTIVES
1. To minimise topsoil and vegetation removal and “land-shaping” on land where residential
subdivisions are
being constructed.
CONTROLS
1. Earthworks shall be
minimised to locations where the construction of roads require earthworks to be
undertaken.
2. Such earthworks may extend into the proposed allotments for the purpose of providing suitable
vehicle
access to the identified building platform referred to in Section 4.
3. Vegetation and topsoil are not to be removed or disturbed in areas outside of the above areas of
proposed
construction.
4. All proposed public open space areas are to be fenced and are not to be disturbed or used for any
purpose
during the construction of a subdivision.
5. Subdivision applications must provide a plan showing the existing pre-development and proposed
finished
ground levels to enable an assessment of the extent of earthworks proposed and assessment of the
relationship between the finished road levels and proposed building platform levels.
6.9 Cut and Fill
OBJECTIVES
1. To provide a landform that is capable of supporting a range of residential, business and industrial
uses.
2. To minimise the impact of earthworks on the stormwater regime, salinity and groundwater.
3. To ensure that the extent of cut and fill required for large scale development does not detract from
the
appearance and design.
4. To ensure that development is capable of visual integration with the surrounding environment.
5. To ensure that any imported fill material to a site is clean and complies with the contamination and
salinity
provisions of this section.
6. To ensure land is appropriately stabilised and retained.
7. To ensure that the extent of cut and fill does not encroach within, or...