complete the level In 5. DOUBLE-RODDED LEVELING. Set up and the for a double-rodded line from BM45 to BM46. following rod readings H refers to stations along the stations along notes high route and to...


Please provide a
scanned written or computerizedclear and complete step-by-step solutions.


complete the level<br>In<br>5. DOUBLE-RODDED<br>LEVELING. Set<br>up and<br>the<br>for a double-rodded line from BM45 to BM46.<br>following rod readings H refers to stations along the<br>stations along<br>notes<br>high<br>route<br>and<br>to<br>the<br>low<br>route:<br>BS<br>on<br>FS on TP1 (L) =1.252, BS on<br>FS on TP2 (H)=1.173, FS on<br>BM45=2.238,<br>FS on TP1 (H) 0.703,<br>TP1 (H) = 2.855, BS on TP1 (L)= 3.402, FS on TP 2 (H) =1.173, FS on<br>TP 2 (L) =1.558, BS on TP 2 (H) = 2.542, , FS on<br>TP 3 (H) =1.339, FS on TP 3 (L)=1.660, BS on TP 3 (H) = 2.390, BS on<br>and FS on BM46=1.015 meters. Assume that the<br>customarY<br>%3D<br>%3D<br>BS on TP 2 (L) 2.932,<br>%3D<br>%|<br>TP3 (L) = 2.711,<br>of<br>arithmetic check.<br>%3D<br>elevation<br>BM45<br>is 524.550 m.<br>Perform<br>the<br>

Extracted text: complete the level In 5. DOUBLE-RODDED LEVELING. Set up and the for a double-rodded line from BM45 to BM46. following rod readings H refers to stations along the stations along notes high route and to the low route: BS on FS on TP1 (L) =1.252, BS on FS on TP2 (H)=1.173, FS on BM45=2.238, FS on TP1 (H) 0.703, TP1 (H) = 2.855, BS on TP1 (L)= 3.402, FS on TP 2 (H) =1.173, FS on TP 2 (L) =1.558, BS on TP 2 (H) = 2.542, , FS on TP 3 (H) =1.339, FS on TP 3 (L)=1.660, BS on TP 3 (H) = 2.390, BS on and FS on BM46=1.015 meters. Assume that the customarY %3D %3D BS on TP 2 (L) 2.932, %3D %| TP3 (L) = 2.711, of arithmetic check. %3D elevation BM45 is 524.550 m. Perform the

Jun 11, 2022
SOLUTION.PDF

Get Answer To This Question

Related Questions & Answers