Calculate peak runoff using the Rational Method for the drainage basin shown in for a 15-year storm. The basin is located in New Jersey. For an average stream cross section, use that in Example 11-1....


Calculate peak runoff using the Rational Method for the drainage basin shown in for a 15-year storm. The basin is located in New Jersey. For an average stream cross section, use that in Example 11-1. Assume that the entire basin is wooded.


Calculate peak runoff using the NRCS Method for the watershed shown in for a 50-year storm. The watershed is located in central New York State. For an average stream cross section, use that in problem 6. Assume hydrologic soil group B (65 percent), C (25 percent), D (10 percent).